05-07-2022, 03:00 PM
Mid West Dubber Wrote:Long side vertical supports repaired and inner sill clamped in for trial fit. Also front section of wheel arch cut out and repair section clamped in place...
Front right side outrigger prepared and welded in...
The right rear outrigger prep'd and welded in...
Front of wheel arch welded in and ground back. Also inner sill welded in place. Forgot to take more pics of this...